QUALITY MANAGEMENT

Quality is verified, recorded and managed before delivery.

Across regions, quality cannot depend on verbal promises. Dinglian aligns drawings, processes, suppliers and inspection evidence before finished parts reach the customer.

ISO 9001

Re-implementation planned

CMM

Dimensional verification

KEYENCE

Vision measurement

100%

Inspection when required

QUALITY SYSTEM & DOCUMENTS

ISO 9001 is being prepared for re-implementation.

Jintat previously implemented ISO 9001 quality management practices. The team is now planning re-certification and documentation updates to strengthen process standardization, inspection records and internal control.

ISO 9001Re-implementation planned

Jintat previously implemented ISO 9001 practices and is planning re-certification and documentation updates

CMM / KEYENCEInspection capability

Critical dimensions can be verified through CMM, Keyence vision measurement and shipment inspection records

DOC CONTROLProject documentation

One project manager controls drawing revisions, process records, inspection reports and delivery documents

INSPECTION EQUIPMENT

Inspection methods are selected by part risk.

CMM inspection

CMM inspection

Dimensional verification for critical tolerances, datum relationships and inspection reports.

Optical / vision measurement

Optical / vision measurement

Suitable for profiles, hole positions, edge conditions and small-feature verification.

Surface and conventional gauges

Surface and conventional gauges

Surface finish, thread, fit and production checks are planned according to part function.

01

Requirement clarification

Material, tolerance, finish, quantity and target delivery are reviewed before release.

02

Process control

Manufacturing routes and responsible partners are matched to the project requirements.

03

In-process verification

Critical dimensions and process conditions are checked at appropriate manufacturing stages.

04

Final inspection

CMM, vision measurement and conventional gauges are applied according to part needs.

05

Documentation

Inspection records and requested process documentation are confirmed before delivery.